Getty Images 914679344 2880w
Termites

Pre-construction termite protection in Perth

Under-slab and perimeter termite protection installed to AS 3660.1:2014, with certification for building certifiers.

Termites

Protection before the slab goes down

Pre-construction termite protection is installed before the slab is poured, treating the soil and key entry points so termites can't get into the building once it's complete. Elite Pest Control installs chemical soil treatment, physical barriers, and slab-edge protection to AS 3660.1:2014, and issues a certificate of installation for the building certifier.

Thinkstock Photos 529352287 2880w
What's included

Everything covered in your pre-construction termite protection, from slab to certificate


Everything covered in your pre-construction termite protection, from slab to certificate

Under-slab soil treatment

Applied before the slab is poured, treating the ground the build sits on.

Slab curing treatment

Reduces cracking in warmer months, including Concure where required.

Slab edge water membrane

Prevents moisture encroaching the edge of the slab.

Homeguard physical barrier

FMX Homeguard Blue to parapet and boundary walls, FMC Homeguard White under the slab, both carrying a 50 year manufacturer warranty.

Collar and pipe protection

At all pipe penetrations, including bathrooms, laundries and kitchens.

Perimeter reticulation piping

Installed for future chemical top-ups without drilling.

Certificate of installation

Issued for the building certifier.

Pre-construction pricing

Priced per job, quoted from your plans

Pre-construction termite protection is priced per job. Slab size, barrier type, site access and build stage all affect the final cost, so there's no single “from” price that means anything until we've seen the plans.

On-site and over-the-phone quoting is obligation free — send through the site plans or give us a call and we'll get a number back to you fast.

Request a trade quote
Priced per job, quoted from your plans
Our process

How a pre-construction job runs, step by step


Site assessment
01

Site assessment

Reviewed against the build program to confirm the right treatment before the slab pour.

Soil and barrier treatment
02

Soil and barrier treatment

Under-slab treatment applied, physical barriers installed to parapet, boundary and perimeter areas as required.

Pipe and penetration protection
03

Pipe and penetration protection

Collar and pipe treatment applied to all moisture-prone penetrations.

Certification
04

Certification

Certificate of installation issued for the building certifier.

Coordination
05

Coordination

Treatment scheduled around the slab pour, plumbers and other trades to avoid holding up the build.

Guarantee
Our promise

Guarantee

  • 50-year manufacturer warranty

    Homeguard physical barrier products carry a 50 year manufacturer warranty.

Credentials
Licensed & accredited

Credentials

  • Licensed pest management technicians, WA Department of Health

  • Termite and timber pests endorsement

  • Treatment installed to AS 3660.1:2014 (Termite management, Part 1: New building work), a Primary Referenced Standard in the National Construction Code

  • AEPMA membership / PestCert accreditation

  • Certificate of installation issued for every job, for submission to the building certifier

FAQ

Questions we get asked

There's no standard price. Cost depends on slab size, barrier type, site access and build stage, so an accurate figure needs the site plans. Quoting is obligation free and turned around fast, call or send through the plans.

AS 3660.1:2014 is a Primary Referenced Standard in the National Construction Code, so termite management is a compliance requirement for new building work. A certificate of installation is generally required by the building certifier before the build can proceed to completion.

Chemical soil treatment kills termites that attempt to cross the treated zone. Physical barriers, like Homeguard, block entry points and force termites into the open where they can be detected. Most builds use a combination of both for full perimeter coverage.

Under-slab soil treatment and slab edge protection need to be installed before the slab is poured. Boundary and parapet wall barriers, and pipe collar protection, can be coordinated around later stages of the build.

No. Treatment is scheduled to fit the build program, working around the slab pour, plumbers and other trades rather than delaying them. Site assessment happens early enough in the process that termite protection is factored into the timeline, not treated as an afterthought that pushes the pour back.

A certificate of installation confirming the treatment applied, the standard it was installed to, and the areas covered. This is the documentation building certifiers require to confirm the termite management requirement under the National Construction Code has been met before the build can proceed to completion.

Last updated